Battery Room

Design and Installation of Battery Charging Rooms for Electric Forklifts

Safe, Efficient Traction Battery Rooms Compliant with Current Regulations.

Battery Charging Hall Experts

What is a Battery Charging Room?

Why choose Grupo TICE for the Design and Installation of Battery Rooms

Designing a battery room requires technical knowledge, up-to-date regulations, and a comprehensive approach to ensure safe and efficient implementation. At Grupo TICE, we combine engineering, experience in electrical projects, and industrial safety criteria to offer completely reliable and well-documented solutions.

Expert Engineering

Our team has extensive experience in electrical engineering and industrial safety, enabling us to design robust, appropriately sized battery rooms that are tailored to the actual use of electric forklifts in logistics and industrial environments.

Normative Knowledge

We rigorously apply the requirements of OSH, industrial ventilation, low voltage electrical installations (REBT), and ATEX requirements where applicable. This ensures that each room complies with current regulations and offers a safe, controlled, and fully verifiable charging environment.

Comprehensive Service

We cover the entire project: technical design, installation, regulatory documentation and training for the responsible staff. This approach ensures the room is correctly implemented from day one and prepared to pass audits and inspections.

Technical Advice

We offer clear and practical guidance to warehouse managers and Health & Safety departments, facilitating understanding of operational requirements and the safety measures needed to work with batteries with complete reliability.

You need to Design or Adapt a Battery Charging Room in your Warehouse.

Who is the Battery Room Design and Installation Service for Electric Forklifts aimed at?

Benefits of Installing a Battery Room Designed by TICE Group

The ISM365 service follows a structured process that allows for the evaluation, verification, and certification of the actual status of each machine's safety systems. Our methodology guarantees a complete, traceable analysis focused on maintaining compliance with RD 1215/1997 throughout the year.

Regulatory Requirements for Battery Charging Rooms

Technical Experience and Warranty in Battery Charging Rooms

Years of Experience
+ 0
Projects Completed
+ 0
Advised Companies
+ 0

Work Methodology in the Design and Installation of Battery Rooms

Before commencing any project, at Grupo TICE we follow a structured methodology that ensures the battery room is designed and installed with robust technical criteria, complying with regulations and adapting to the operational pace of the warehouse. This process allows us to offer reliable, documented solutions that are fully aligned with each client's real needs.

At Grupo TICE, we develop Safe, Efficient, and fully Certified Rooms.

FAQs about Our Drum Room Design and Installation Service

Contact Us

Put your Battery Room In the hands of specialists.

Contact our technical team and we will guide you to the most suitable solution.